We convert 500+ page specification manuals into field-ready Procore submittal logs and Primavera P6 baseline schedules in under 24 hours. Zero staff hours spent reading manuals.
Software-ready preconstruction controls built for direct bulk-import into Procore, Autodesk Construction Cloud (ACC), Primavera P6, and Excel.
Complete extraction of every action submittal, mix design, ASTM test standard, and closeout O&M manual requirement across CSI Divisions 01–33.
Identifies hot work permits, confined space entries, utility shutdown notification windows, and agency inspection milestones before breaking ground.
Standard WBS levels, activity codes, calculated durations, and CPM predecessor/successor linkages mapped directly to spec lead times.
Color-coded plan revision comparison highlighting modified storm lines, inlets, footings, structural steel, or grading changes across drawing releases.
Choose per-project turnaround or unlock unlimited monthly growth with our dedicated partner retainer.
Complete extraction of every submittal, material test, and mock-up.
Complete submittal register plus full CPM logic schedule draft ready for P6.
Low predictable monthly base with flexible pay-per-job volume. Scale without limits.
All engineering outputs adhere to CSI MasterFormat, ASTM, ACI, and DOTD standards. 100% industry standard and software-ready.
Standardized engineering formats ready for instant team coordination and PM workflows.
| Service Action | Engineering Scope & Details Extracted | Output Format | Turnaround |
|---|---|---|---|
| Submittal Register | Every action submittal, mix design, ASTM test standard, and closeout O&M manual requirement. | Excel (.xlsx) / CSV | < 24 Hours |
| Advance Notices & Permits | Hot work permits, confined space entry, utility shutdown windows, and agency inspection rules. | Excel / Summary PDF | < 24 Hours |
| Primavera P6 Baseline | Standard WBS levels, activity codes, durations, and logic ties (predecessors/successors). | P6 XER / XML / XLSX | < 24 Hours |
| Drawing Addenda Diffs | Color-coded plan revision comparison highlighting modified storm lines, inlets, or grade changes. | Layered PDF | < 12 Hours |
Send us your active or past spec book link. We'll return your completed deliverables within 24 hours.